The original swimming pool, no longer adequate in environmental terms or competition dimensions, is replaced by a new 25 metre, 6 lane, level deck pool located in the space between the north wing and the squash courts. The two storey volume vacated by the original pool is now divided by a new floor into changing rooms and a studio theatre at the lower level, and a new music department at the upper. |
Substantial noise control measures are required to accommodate this department successfully in the heart of the building. Floating box construction eliminates sound transfer in either direction, whilst perimeter spaces borrow daylight and enjoy views through the quadrangle atrium and the new swimming pool. |
This phase of development has solved several long standing problems whilst adding further interest. |
back >> |
WHp has extensive experience of designing facilities for secondary schools and colleges for further education. |
Involvement with two key clients over a number of years has seen individual projects coalesce into coherent stimulating educational environments where academic standards and personal development can flourish. |